Acquiring the demand of an end customer and submitting the documentation (plans) to JELOVICA.
Creating an intricate offer which defines the total scope of the supply and assembly of wooden prefabricated house elements as well as services.
Signing the agreement
After the confirmation of the offer follows the signing of the agreement determining the delivery deadline and other important specifics. The integral parts of the agreement are the binding contract, sampling protocol, warranty statement and instructions regarding the appropriate preparation of the building site for carrying out the assembly.
Signing the agreement
After the confirmation of the offer follows the signing of the agreement determining the delivery deadline and other important specifics. The integral parts of the agreement are the binding contract, sampling protocol, warranty statement and instructions regarding the appropriate preparation of the building site for carrying out the assembly.
Planning process
We begin the planning and manufacture process at Jelovica according to the signed agreement and received documentation. Included as part of the planning process is the preparation of the bearing capacity of foundation, positional statics and statics calculations. Next comes the preparation of factory/assembly plans and the manufacture of wooden prefabricated house elements.
Manufacture of elements
The planning process is followed by the preparation of factory/assembly plans and the manufacture of wooden prefabricated house elements, installation of windows, entrance doors, shade systems, electrical installations … The manufacture process is concluded with the installation of the facade system. Then we store the elements in our factory for usually 3–5 working days before the delivery.
Laying the base plate
It is of extreme importance that the base plate is constructed according to the highest quality standards. When we speak of wooden prefabricated construction, the height deviations are be very small.
Transport, delivery
The manufacture is followed by the loading of the elements onto arranged semi-trailers and the transport to the building site.
Begin of assembly
In accordance with the delivery date, the assembly begins at 7 am while the assembly schedule is coordinated between JELOVICA, the transport company and the certified assembly team beforehand.
Take-over protocol
After the “rough assembly”, the take-over of wooden prefabricated house elements between the representative assembly team manager and the partner takes place
Finishing the turn-key house
It is important that the partner has their own team or contractual suppliers for the completion of a turn-key project. When selecting a turn-key house, the final customer receives a house into which they can move immediately, with a heating system in place.